+ All Categories
Home > Documents > Bertini Transit Trip Time Modeling

Bertini Transit Trip Time Modeling

Date post: 05-Apr-2018
Category:
Upload: vandamme24
View: 217 times
Download: 0 times
Share this document with a friend

of 71

Transcript
  • 7/31/2019 Bertini Transit Trip Time Modeling

    1/71

    Ro b e r t L. Be r t i n i

    Portland State UniversitySeptember 26, 2003

    Usi n g A r c h i v e d

    St op - Leve l Tr an si tGeo-Loca t ion Dat af or I m p r ov edOp e r a t i o n s a n dP e r f o r m a n c e

    M o n i t o r i n g

  • 7/31/2019 Bertini Transit Trip Time Modeling

    2/71

    O b j e c t i v e sO b j e c t i v e s

    Trends in transittechnologyAVL and APC

    BDS system and dataarchivingPreliminary route levelanalysisOther examplesConclusions andfuture research

  • 7/31/2019 Bertini Transit Trip Time Modeling

    3/71

    Au t o m a t i c v e h i cl e l o ca t i o n ( AVL)A u t o m a t i c v e h i cl e l o ca t i o n ( AVL)

    Determination of vehiclelocationGlobal positioning systems

    (GPS)SignpostsGround-based radio

    Dead-reckoningU.S. transit agencies

    128 operational172 planned

  • 7/31/2019 Bertini Transit Trip Time Modeling

    4/71

    Au t o m a t i c p a ssen g e r co u n t er s ( APC)A u t o m a t i c p a ssen g e r co u n t er s ( A PC)

    Count boarding and alightingpassengersInfrared beams

    U.S. transit agencies60 operational124 planned

  • 7/31/2019 Bertini Transit Trip Time Modeling

    5/71

    AVL/ APC i n t h e Ba y A r e aAVL/ APC i n t h e Ba y A r e a

    1 9 6 [467]1 8 0 4 [2518]TOTAL

    0 [36]312 [362]SamTrans

    0 [135]350San Francisco MUNI

    00 [37]Western Contra Costa

    054 [62]Sonoma County Transit

    080 [86]Santa Cruz

    0 [100]6 [600]Santa Clara VTA019Napa County Transit

    7171Livermore/Amador

    0112 [131 by 2005]Central Contra Costa

    125800 in 2002AC Transit

    APCAVL

    Source: APTS Deployment in the United States Year 2002 Update , USDOT, 2003.

  • 7/31/2019 Bertini Transit Trip Time Modeling

    6/71

    Ar ch i v i n g AVL/ APC Da t aA r ch i v i n g AVL/ APC D at a

    AVL not designed with archived data in mind.Most AVL systems do not deliver data for off-line planning analysis.

    Transit agencies didnt insist on it.APCs designed with archiving in mind.APCs often only in 10-15% of fleet.

    TriMet system driven by APC pays for itself in saved reporting costs

    Source: TCRP H-28 , Uses of Archived AVL-APC Data t o I m prove Transit Perform ance and Managem ent .

  • 7/31/2019 Bertini Transit Trip Time Modeling

    7/71

    A b o u tA b o u t Tr iMetTr iMet

    Serves 1.2 M population575 mi 2

    62.8 M annual bus trips206,600 daily bus boardings

    95 bus routes655 buses8100 bus stops

    Also LRT, Paratransit

  • 7/31/2019 Bertini Transit Trip Time Modeling

    8/71

    Per f o r m an ce m easu r em en tPer f o r m an ce m easu r em en t

    Measuring system performance is the first step toward efficient and proactivemanagement.Increasing attention to transit performanceTransit Capacity and Quality of Service Manual

    Quantitative/qualitativePassenger point of viewLinked to agency operating decisions

    NCHRP Performance Based Planning ManualAccessibilityMobilityEconomic Development

    Improve reliabilityReduce variability of system performanceDelayTravel time

    Attract more ridersReduce operations costsIncrease productivityLink to service standards

  • 7/31/2019 Bertini Transit Trip Time Modeling

    9/71

    I n t h e p astI n t h e p ast

    Data collection moredifficultLow temporal andspatial resolution

    Many people tocollect little data Focus on limited,general, aggregate

    measures for externalreportingNatural airconditioning

  • 7/31/2019 Bertini Transit Trip Time Modeling

    10/71

    TodayToday

    Unlimited coverage andcontinuous durationDesign, extract and testspecific measuresActual system performanceData management/processingchallengesNeed for generating relevantmeasures

  • 7/31/2019 Bertini Transit Trip Time Modeling

    11/71

    Tr iMetTr iMet ss Bu s Disp a t ch Sy st emBu s Di spa t ch Sy st em

    On-BoardComputer

    Radio

    DoorsLift

    APC (Automatic PassengerCounter)

    Overhead Signs

    OdometerSignal Priority Emitters

    Memory Card

    RadioSys tem

    GaragePCs

    Radio AntennaGPS Antenna

    Navstar GPS Satellites

    Control Head

  • 7/31/2019 Bertini Transit Trip Time Modeling

    12/71

    Tr iMetTr iMet ss Bu s Disp a t ch Sy st emBu s Di spa t ch Sy st em

    Sc h e d u l e d e v i a t i o n

    Con t r o l HeadCon t r o l HeadPCMI A Car dPCMI A Car d

  • 7/31/2019 Bertini Transit Trip Time Modeling

    13/71

    Real Tim e Elem en t sReal Tim e Elem en t s

    Radio

    DoorsLift

    APC (Automatic PassengerCounter)

    Overhead Signs

    OdometerSignal Priority Emitters

    Memory Card

    RadioSys tem

    GaragePCs

    Ra d i o A n t e n n aGPS Ant enn a

    N a v st a r GPS Sa t e l l i t e s

    Control Head

    On -B o a r dC o m p u t e r

  • 7/31/2019 Bertini Transit Trip Time Modeling

    14/71

    Real Tim e Elem en t sReal Tim e Elem en t s

    On-boardComputer

    GPSLocation

    ScheduleData

    Radio/CellularCommunications

    90 secUpdates

    D i sp a t ch a n d Co n t r o l A r r i v a l Pr e d i ct i o n

  • 7/31/2019 Bertini Transit Trip Time Modeling

    15/71

    Ar ch i v e d El em e n t sA r ch i v e d El em en t s

    Radio

    D o o r sLi f t

    A PC ( A u t o m a t i c P a ss e n g e rC o u n t e r )

    O v e r h e a d S ig n s

    O d o m e t e rSi g n a l Pr i o r i t y Em i t t e r s

    M e m o r y Ca r d

    RadioSys tem

    GaragePCs

    Ra d i o A n t e n n aGPS Ant enn a

    N a v st a r GPS Sa t e l l i t e s

    Co n t r o l H e a d

    On -B o a r dC o m p u t e r

  • 7/31/2019 Bertini Transit Trip Time Modeling

    16/71

    Ar ch i v e d El em e n t sA r ch i v e d El em en t s

    On-boardComputer

    GPSLocation

    ScheduleData

    APC/Lift

    PCMIACard

    Ev e n t D a t a[ O p e r a t o r ]

    Pass up OverloadTraffic DelayTrain/Bridge DelayFare EvasionGraffiti/Vandalism

    Stop Data[Automatic]

  • 7/31/2019 Bertini Transit Trip Time Modeling

    17/71

    Ev en t Da t a : Far e Ev as ionEv en t Da t a : Far e Ev as ion

  • 7/31/2019 Bertini Transit Trip Time Modeling

    18/71

    Ar ch i v e d El em e n t sA r ch i v e d El em en t s

    On-boardComputer

    GPSLocation

    ScheduleData

    APC/Lift

    PCMIACard

    Event Data[Operator]

    St o p D a t a[ A u t o m a t i c ]

    Scheduled

    Unscheduled

  • 7/31/2019 Bertini Transit Trip Time Modeling

    19/71

    St o p D a t aSt o p D at a

    TIME LINE

    DWELLTIME

    D O O R O P E N

    D O O R C L O S E

    ARRIVE TIME

    LEAVE TIME

    REWRITTEN ARRIVE TIME (IF DOOR OPENS)

    STOP LOCATION

    1 5 M E T E R S

    3 0 M E T E

    R S

  • 7/31/2019 Bertini Transit Trip Time Modeling

    20/71

    St o p D a t aSt o p D at a

    R o u

    t e N o

    .

    S e r v i c e

    D a t e

    L e a v e

    T i m e

    S t o p

    T i m e

    A r r

    i v e

    T i m e

    B a d g e

    D i r e c

    t i o n

    T r i p

    N o .

    L o c a

    t i o n

    I D

    D w e l

    l

    D o o r

    L i f t

    O n s

    O f f s

    E s t .

    L o a d

    M a x

    S p e e d

    P a t

    t e r n

    D i s t a n c e

    X C o o r .

    Y C o o r .

    14 01NOV2001 8:53:32 8:49:15 8:53:28 285 0 1120 4964 0 0 0 0 0 21 41 10558.58 7644468 676005

    14 01NOV2001 8:55:00 8:51:41 8:54:46 285 0 1120 4701 4 0 0 0 1 20 50 15215.05 7649112 67632814 01NOV2001 8:56:22 8:52:00 8:55:08 285 0 1120 4537 36 3 0 6 0 26 34 15792.35 7649674 676220

    Route NumberVehicle NumberService DateActual Leave TimeScheduled Stop TimeActual Arrive TimeOperator ID

    DirectionTrip NumberBus Stop Location

    Dwell TimeDoor OpenedLift UsageOns & Offs (APCs)Passenger LoadMaximum Speedon Previous Link

    DistanceLongitudeLatitude

  • 7/31/2019 Bertini Transit Trip Time Modeling

    21/71

    Tr iMetTr iMet ss Bu s Disp a t ch Sy st emBu s Di spa t ch Sy st em

  • 7/31/2019 Bertini Transit Trip Time Modeling

    22/71

    St o p D a t a : Pa sse n g e r M o v e m e n tSt o p D a t a : Pa sse n g e r M o v e m e n t

  • 7/31/2019 Bertini Transit Trip Time Modeling

    23/71

    Rou t e 1 4 Case St u d yRou t e 14 Case St u d y

  • 7/31/2019 Bertini Transit Trip Time Modeling

    24/71

    Rou t e 1 4 Case St u d yRou t e 14 Case St u d y

    7.9 miles long

    105 scheduled trips per weekday64 scheduled stops40-45 min scheduled trip time (mean 43.3, SD 2.7 min)

    3-55 min headways (mean 11.4 min)Focus on two weeks April 1-12, 2002 [>1000 runs]Morning inbound from SE 94th/Foster to NW 4th/HoytCrossing Hawthorne Bridge

  • 7/31/2019 Bertini Transit Trip Time Modeling

    25/71

    Ap r i l 1 A .M. I n b o u n d Tr i p sAp r i l 1 A .M . I n b o u n d Tr i p s

    0

    1

    2

    3

    4

    5

    6

    7

    5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:0

    D i s t a n c e

    ( m i l e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    26/71

    Ap r i l 1 A .M. I n b o u n d Tr i p sAp r i l 1 A .M . I n b o u n d Tr i p s

    0

    1

    2

    3

    4

    5

    6

    7

    5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:0

    D i s t a n c e

    ( m i l e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    27/71

    Ap r i l 1 A .M. I n b o u n d Tr i p sAp r i l 1 A .M . I n b o u n d Tr i p s

    0

    1

    2

    3

    4

    5

    6

    7

    5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:0

    D i s t a n c e

    ( m i l e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    28/71

    Ap r i l 1 A .M. I n b o u n d Tr i p sAp r i l 1 A .M . I n b o u n d Tr i p s

    0

    1

    2

    3

    4

    5

    6

    7

    5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:0

    D i s t a n c e

    ( m i l e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    29/71

    Ap r i l 1 : Tw o I n b o u n d Tr i p sAp r i l 1 : Tw o I n b o u n d Tr i p s

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8:30 8:45 9:00 9:15 9:30

    Time

    D i s t a n c e

    ( m i l e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    30/71

    Ap r i l 1 : Tw o I n b o u n d Tr i p sAp r i l 1 : Tw o I n b o u n d Tr i p s

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8:30 8:45 9:00 9:15 9:30

    Time

    D i s t a n c e

    ( m i l e s

    )

    Trip 1290Badge 996 (28 yrs exp)Median 1.2 min late

    Trip 1295Badge 2606 (4 yrs exp)Median 0.9 min late

    Two latedepartures

    One late, oneearly arrival

  • 7/31/2019 Bertini Transit Trip Time Modeling

    31/71

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8:30 8:45 9:00 9:15 9:30

    Time

    D i s t a n c e

    ( m i l e s

    )

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    Ap r i l 1 : I m p act o fAp r i l 1 : I m p act o f PaxPax LoadLoad

    Tr i p 1 2 9 0Load

    P a s s e n g e r

    L o

    a d

  • 7/31/2019 Bertini Transit Trip Time Modeling

    32/71

    OnOn -- t i m e Per f o r m an cet i m e Per f o r m an ce

    0

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    4,000

    4,500

    5,000

    - 8 - 7 - 6 - 5 - 4 - 3 - 2 - 1 0 1 2 3 4 5 6 7 8 9 1 0

    1 1

    1 2

    1 3

    1 4

    1 5

    1 6

    1 7

    1 8

    1 9

    2 0

    Late/Early (minutes)

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    All "stops"n = 66,012Median = 0.6 min Late

    32% Early

  • 7/31/2019 Bertini Transit Trip Time Modeling

    33/71

    OnOn -- t i m e Per f o r m an cet i m e Per f o r m an ce

    0

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    4,000

    4,500

    5,000

    - 8 - 7 - 6 - 5 - 4 - 3 - 2 - 1 0 1 2 3 4 5 6 7 8 9 1 0

    1 1

    1 2

    1 3

    1 4

    1 5

    1 6

    1 7

    1 8

    1 9

    2 0

    Late/Early (minutes)

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    TriMet Service Standard

    [-1 min +5 min]85% On-time11% Early4% Late

  • 7/31/2019 Bertini Transit Trip Time Modeling

    34/71

    OTP v s . Tim e of DayOTP v s . Tim e of Day

    -30

    -20

    -10

    0

    10

    20

    30

    5:00 7:00 9:00 11:00 13:00 15:00 17:00 19:00 21:00 23:00

    Time

    E a r l y

    / L a

    t e ( m i n u

    t e s

    )

  • 7/31/2019 Bertini Transit Trip Time Modeling

    35/71

    Tr iMetTr iMet Op e r a t o r Ex p e r i en ceOp e r a t o r Ex p e r i en ce

    0

    100

    200

    300

    400

    500

    0 4 8 12 16 20 24 28 32 36 40

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%n = 3,249Mean = 9.8 years

  • 7/31/2019 Bertini Transit Trip Time Modeling

    36/71

    Tr iMetTr iMet Ope r a t o r OTPOper a t o r OTP

    -3

    -2

    -1

    0

    1

    2

    3

    4

    5

    6

    1

    Operator

    M e d i a n

    L a

    t e / E a r

    l y

    April 1-12, 2002

    Route 14 Inbound94 Operators65,848 stops

  • 7/31/2019 Bertini Transit Trip Time Modeling

    37/71

    Tr iMetTr iMet Ope r a t o r OTPOper a t o r OTP

    -3

    -2

    -1

    0

    1

    2

    3

    4

    5

    6

    0 5 10 15 20 25 30

    Years Experience

    M e

    d i a n

    E a r l y / L a

    t e

    April 1-12, 2002Route 14 Inbound

    94 Operators65,848 stops

    LateEarly

  • 7/31/2019 Bertini Transit Trip Time Modeling

    38/71

    St o p Le v e l Pe r f o r m a n ceSt o p Le v e l Pe r f o r m a n ce

    0:00

    0:05

    0:10

    0:15

    0:20

    0:25

    0:30

    0:00 0:05 0:10 0:15 0:20 0:25 0:30Actual Headway

    S c

    h e

    d u

    l e d H e a d w a y

    April 1, 2002

    Stop No. 2606

    Hawthorne/ 22nd Ave

    Mean Headway 11:02 min

    St. Dev. 7:10

  • 7/31/2019 Bertini Transit Trip Time Modeling

    39/71

    St o p Le v e l Pe r f o r m a n ceSt o p Le v e l Pe r f o r m a n ce

    April 1, 2002

    Stop No. 2606

    Hawthorne/SE 22nd Ave

    Mean Headway 11:02 min

    St. Dev. 7:100

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00

    Time

    C u m u

    l a t i v e

    B u s

    A r r i v a

    l N u m

    b e r

    ScheduledActual

  • 7/31/2019 Bertini Transit Trip Time Modeling

    40/71

    Ro u t e 1 4 : Tr i p Ti m e Mo d e lRo u t e 1 4 : Tr i p Ti m e Mo d e l

    boardingpassengersalightingpassengers

    dwellsofnumbertimetripnonstopaverage0

    0

    =

    =

    =

    =

    +++=

    b

    a

    d

    b a d

    N

    N

    N

    T

    cN bN aN T T

  • 7/31/2019 Bertini Transit Trip Time Modeling

    41/71

    Dw el l Ti m eDw el l Ti m e

    0

    1,000

    2,000

    3,000

    4,000

    5,000

    6,000

    7,000

    0 1 0

    2 0

    3 0

    4 0

    5 0

    6 0

    7 0

    8 0

    9 0

    1 0 0

    Dwell (sec)

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100

    Nonzero Dwellsn = 34,456Mean = 13.3 sSD = 20.3 sLift use = 232 times

  • 7/31/2019 Bertini Transit Trip Time Modeling

    42/71

    D w el l Ti m e v s . Pa ssen g e r M o v e m en tD w el l Ti m e v s . Pa ssen g e r M o v e m e n t

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    0 5 10 15 20 25 30 35 40 45

    Passenger Movement

    D w e

    l l T i m e ( s

    e c

    )Off

    28%

    On61%

    On + Off

    4%

    None

    7%

  • 7/31/2019 Bertini Transit Trip Time Modeling

    43/71

    B o a r d i n g sB o a r d i n g s

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    0 1 2 3 4 5 6 7 8 9 1 0

    1 1

    1 2

    1 3

    1 4

    1 5

    1 6

    1 7

    1 8

    1 9

    2 0

    Boardings

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    n = 37,441Mean = 1.33SD = 2.45Max = 37

  • 7/31/2019 Bertini Transit Trip Time Modeling

    44/71

    A l i g h t i n g sA l i g h t i n g s

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    0 1 2 3 4 5 6 7 8 9 1 0

    1 1

    1 2

    1 3

    1 4

    1 5

    1 6

    1 7

    1 8

    1 9

    2 0

    Alightings

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%n = 36,978Mean = 1.31SD = 2.62Max = 37

  • 7/31/2019 Bertini Transit Trip Time Modeling

    45/71

    Dw el l Ti m e M o d elDw el l Ti m e M o d el

    021,795.063.6Dwell:OnlyAlighting

    357,1527.403.6Dwell:OnlyBoarding

    layover]no,G""APClift,nozero,-[non995,2496.087.294.5TimeDwell

    =

    +=

    =

    +=

    ==

    ++=

    n

    N

    n

    N

    n

    N N

    a

    b

    a b

  • 7/31/2019 Bertini Transit Trip Time Modeling

    46/71

    0

    200

    400

    600

    800

    1,000

    1,200

    1,400

    1,600

    1,800

    2,000

    0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0

    Link Distance (miles)

    T r a v e

    l T i m e

    ( s e c

    )

    N o n st o p Tr i p Ti m eN o n st o p Tr i p Ti m e

    n = 30,036 links

    NSTT=15.3+191.2 x (sec)

  • 7/31/2019 Bertini Transit Trip Time Modeling

    47/71

    Tr i p Ti m e M o d e lTr i p Ti m e Mo d e l

    boardingpassengers

    alightingpassengersdwellsofnumber

    87.296.02.211606

    =

    =

    =

    +++=

    b

    a

    d

    b a d

    N

    N N

    N N N T

  • 7/31/2019 Bertini Transit Trip Time Modeling

    48/71

    Ru n Ti m e s: A p r i l 1Ru n Ti m e s: Ap r i l 1 -- 1 2 , 2 0 0 21 2 , 2 0 0 2

    0

    10

    20

    30

    40

    50

    60

    70

    6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00

    Arrive Time

    R u n

    T i m e

    ( m

    i n )

    n =856 tripsMean on=40/tripMean off=40/tripMean no. of dwells=35/trip

  • 7/31/2019 Bertini Transit Trip Time Modeling

    49/71

    Ru n Ti m e s: A p r i l 1Ru n Ti m e s: Ap r i l 1 -- 1 2 , 2 0 0 21 2 , 2 0 0 2

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    2 6

    2 8

    3 0

    3 2

    3 4

    3 6

    3 8

    4 0

    4 2

    4 4

    4 6

    4 8

    5 0

    5 2

    5 4

    5 6

    5 8

    6 0

    Run Time (minutes)

    F r e q u e n c y

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    n =856 tripsMean=41.5 minSD=5.1 min

  • 7/31/2019 Bertini Transit Trip Time Modeling

    50/71

    Ru n Ti m e v s . Op e r a t o r Ex p e r i en ceRu n Ti m e v s . Op e r a t o r Ex p e r i e n ce

    0

    10

    20

    30

    40

    50

    60

    1973 1976 1979 1982 1984 1987 1990 1993 1995 1998 2001

    Hire Date

    M e a n

    R u n T

    i m e

    n =856 trips83 operatorsRun time/experience relationship (95% confidence)

  • 7/31/2019 Bertini Transit Trip Time Modeling

    51/71

    A ct u a l v s . Pr e d i ct e d Ru n Ti m eA ct u a l v s . Pr e d i ct e d Ru n Ti m e

    20

    25

    30

    35

    40

    45

    50

    55

    60

    20 30 40 50 60

    Actual Run Time

    P r e

    d i c t e d R u n

    T i m e

    594592Veh-hrs7.4 min5.1 minSD

    41.6 min41.5 minMean

    P r e d i c t e dA c t u a ln =856

  • 7/31/2019 Bertini Transit Trip Time Modeling

    52/71

    St op Con so l id a t i on Ana ly si sSt op Con so l id a t i on Ana ly si s

    Route 14 length 41710 feet, 64 stops

    Mean stop spacing 670 feetConsolidate stops to 1000 foot spacingeliminate 10 stopsReduce trip time 21.2 sec per stop, save 3.5 min perinbound run105 inbound trips per day 6.1 hours savings ($60/hr +/-)Add ~9 trips using existing resourcesImprove mean headway 11.4 10.4 min

    Does it affect demand?

  • 7/31/2019 Bertini Transit Trip Time Modeling

    53/71

    Bo ar d i n g Ar e a I m p r o v em en t An a ly s i sBo ar d i n g A r ea I m p r o v em en t An a ly si sStreamlining program to reduce dwelltime

    Curb extensionsNearside farside conversionSmart cards

    Mean boarding time estimated 2.87 secReduce boarding time by 1 sec at top tenlocationsTotal of 1800 passengers boarded atthese locationsSave 30 min/day

  • 7/31/2019 Bertini Transit Trip Time Modeling

    54/71

    Ot h e r Ap p l i ca t i o n sOt h er A p p l i ca t i o n s

  • 7/31/2019 Bertini Transit Trip Time Modeling

    55/71

    Ot h e r Ap p l i ca t i o n sOt h er A p p l i ca t i o n s

    1 censustract

    0.25-mibuffers

    38% of population

  • 7/31/2019 Bertini Transit Trip Time Modeling

    56/71

    Tr a n s i t Si g n a l Pr i o r i t yTr a n s i t Si g n a l Pr i o r i t y

  • 7/31/2019 Bertini Transit Trip Time Modeling

    57/71

    Tr a n s i t Si g n a l Pr i o r i t yTr a n s i t Si g n a l Pr i o r i t y

    Reduce run time and schedule variability180 intersections complete, 100 more in 2003Emitter turned on if bus is >90 sec late

    Remains on until

  • 7/31/2019 Bertini Transit Trip Time Modeling

    58/71

    Tr a n s i t Si g n a l Pr i o r i t yTr a n s i t Si g n a l Pr i o r i t y

  • 7/31/2019 Bertini Transit Trip Time Modeling

    59/71

    Ex p r ess Bu ses a s Fr eew ay Pr ob esEx pr ess Bu ses a s Fr eew ay Pr ob es

  • 7/31/2019 Bertini Transit Trip Time Modeling

    60/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

  • 7/31/2019 Bertini Transit Trip Time Modeling

    61/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

  • 7/31/2019 Bertini Transit Trip Time Modeling

    62/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    b l

  • 7/31/2019 Bertini Transit Trip Time Modeling

    63/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    b lB P b A i l

  • 7/31/2019 Bertini Transit Trip Time Modeling

    64/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    B P b A i lB P b A i l

  • 7/31/2019 Bertini Transit Trip Time Modeling

    65/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    B P b A i lB P b A t i l

  • 7/31/2019 Bertini Transit Trip Time Modeling

    66/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    Vveh = 0.84 V pseudo

    tt veh = 1.23 tt pseudo

    B P b A t i lB P b A t i l

  • 7/31/2019 Bertini Transit Trip Time Modeling

    67/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    B i r d s d a l e

    A v e

    .

    T o w

    l e A v e

    .

    E a s t m a n

    P k w y .

    M a i n

    A v e

    .

    W a l

    t e r s

    R d .

    C l e v e

    l a n d

    A v e

    .

    H o o

    d A v e

    .

    H o g a n

    A v e

    .

    TriMetRoute 9

    Probe Vehicle Run

    Signalized IntersectionBus Stop

    Legend

    B P b A t i lBu ses a s Pr ob es on Ar t e r i a l s

  • 7/31/2019 Bertini Transit Trip Time Modeling

    68/71

    Bu ses a s Pr ob es on Ar t e r i a l sBu ses a s Pr ob es on Ar t e r i a l s

    Before (sec) 172 200 168 178 212 142

    After (sec) 169 182 131 130 224 122

    EB Probe EB Bus EB Hypothetical WB Probe WB Bus WB Hypothetical

    EASTBOUND WESTBOUND

    2% Savings

    9% Savings

    -6% Savings

    14% Savings

    27% Savings22% Savings

    Discuss ionDiscuss ion

  • 7/31/2019 Bertini Transit Trip Time Modeling

    69/71

    Discuss ionDiscuss ion

    Other uses for the BDS data?Conclusions?Save all of your data!

    Ask for archiving capabilities

    A c k n o w l e d g e m e n t sA c k n o w l e d g e m e n t s

  • 7/31/2019 Bertini Transit Trip Time Modeling

    70/71

    A c k n o w l e d g e m e n t sA c k n o w l e d g e m e n t s

    Steve Callas, TriMet

    Ahmed El-Geneidy, JamesStrathman, Thomas Kimpel,Kenneth Dueker, Center forUrban StudiesSutti Tantiyanugulchai, Civil & Environmental EngineeringNational Science FoundationOregon Department of TransportationCity of PortlandFederal Transit Administration

    Mo r e i n f o r m at i onMo r e i n f o r m at i on

  • 7/31/2019 Bertini Transit Trip Time Modeling

    71/71

    Mo r e i n f o r m at i onMo r e i n f o r m at i on

    Email: [email protected]: http://www.its.pdx.eduTriMet data readily available.


Recommended