JAN TYRPEKL
CV
portfolio Jan Tyrpekl 2010
JAN TYRPEKL ADDRESS: U parku 348, Strancice, 251 63 Czech Republic MOBIL: +420 739 016 495 EMAIL: [email protected], [email protected] ICQ: 278-630-738 FACEBOOK: Jan Tyrpekl WWW: http://tyrpekl.blogspot.com/
EDUCATION 2005-2010 Bachelors, Architecture and Urbanism, The Faculty of Art and Architecture, The Technical University of Liberec (CZ)1997-2005 Secondary grammar school Jana Amose Komenskeho, Ricany (CZ)
STUDIOS 1+2. semester - Ing.arch. akad.arch. Jiri Suchomel > 3. semester Ing.arch. Zdenek Franek > 4. semester doc. Martin Rajnis > 5. semester - Ing.arch. akad.arch. Jiri Suchomel > 6. semester - Ing.arch. Jiri Bucek > 7.semester - Ing.arch. Zdenek Franek > Bachelor project - Ing.arch. akad.arch. Jiri Suchomel
WORKSHOPS2009_International workshop in Lille - (re)Use, cole darchitecture et de paysage de Lille, France 2008_ing.arch. Benda - Shuzou masterplan, China - FUATUL, CZ 2007_doc. Martin Rajnis - building of hangar Scholzberg, Maxov, CZ
PROFESSIONAL EXPERIENCE 2010_Henning Larsen Architects, Copenhagen, Denmark competitions: A+D Alborg Havn, Denmark(1st prize), Statoil, NOVONORDISK New Headquarter, Denmark (1st prize), Energinet,Denmark (the results are not published yet) Gotebori Energi, Sweden (the results are not published yet), Niels Bohr Insitute, openhagen, Denmark (the results are not published yet) projects: Crystal Towers, King Abdullah Financial District, Riyadh, Saudi Arabia2009_Studio David, project of the villa, Liberec building of wooden house in cooperation with classfellows (carpenter), Semily, CZ2008 _FAM Architekti, CZ project: Mirove square, Dobris2007 _vizualization for the estate agency AXA _worker, later works foreman on family houses, Ricany REFERENCE prof.Ing.arch.akad.arch. Jiri Suchomel, [email protected], The Technical University of Liberec, mob: +420 777 088 788 Sren llgaard, Architect, Associate and Creative Manager, Henning Larsen Architects, mail: [email protected], tel: +45 8233 3076 PC ABILITIESRhinoceros, ArchiCad, Photoshop, Cinema 4D, FryRender, InDesign, Illustrator, AutoCad, SketchUp, VirtualDub, Premiere, Office
LANGUAGES: English/Czech
INTERESTSliterature (philosophy, poetry), travelling (hitchhiking), art, sport(football, rock climbing, badminton, tennis, bike, snowboard, paragliding), chess OTHERS driving licence B, pilot licence PL-A TRAVELS/ARCHITECTONIC FIELD TRIPS (mostly by hitchhiking)Great Britain, London, Aberdeen, Edinburgh, France, Reims, Lille, Rouen, Rennes, Chartres, Paris(2x), Orleans, Versailles, Clermont-Ferrand, Montpellier, Avignon, Sardinie, Germany, Berlin(6x), Mnchen(2x), Dresden(3x), Netherlands, Amsterdam, Utrecht, Belgium, Brussels, Denmark, Esbjerg, Vejle, Copenhagen, Norway, Oslo(2x), Lillehammer, Sweden, Gteborg, Malm(4x), Austria, Vienna(4x), Salzburk, Langenlois, Krems, Bregenz, Liechtenstein, Switzerland, Zurych(2x), Basel, Chur, Vals, Geneva, Slovenia, Lublana, Italy, Como, Milano, Brescia, Verona, Venezia(4x), Bologna, Ravenna, Florencie, Pisa, Orvieto, Rome(3x), Pompei, Siena(2x), Perugia, San Gimignano, Lucca, Mantova, Rimini, Arezzo, Neapol, Capri, Palermo, Agrigento, Syracusa, Slovakia, Bratislava(3x), Hungary, Gyr, Budapest(3x), Kecskemt,Eger, Tokaj, Miskolc, Bulgary, Sofia, Plovdiv, Turkey, Istanbul, Edirne, Greece, Delphi, Athens(2x), Korinthos, Meteora, Nafplio, Epidauros, Crete, Gortys, Knossos, Crotia, Spain, Barcelona, Valencie, Madrid, Toledo, Merida, Bilbao, San Sebastian, Ukraine, Lviv, Kyiv, Kharkov, Donetsk, Feodesiia, Koktobel, Yalta, Sevastopol
CV
PROJECTS
portfolio Jan Tyrpekl 2010
1 The extension of Bode Museum 2 Flat house
3 Papirove namesti
4 Eko sport hotel Montanie
5 Urbanism, family house and attached houses
6 Sport hall
7 Mixed-use house
8 Houses in building gap
9 Crossroads
10 Aviary
11 Boat house
12 Church
13 Shopping mall
14 Congress centre
15 Pedestrian bridge
16 View-tower
PROJECTS
11
2,3,108
8
7
6
5
4
16
1
project no. 01 THE EXTENSION OF BODE MUSEUM Museum Island, Berlin, GE
portfolio Jan Tyrpekl 2010
instructor: prof.ing.arch.akad.arch. Jiri Suchomel
program: permanent exhibition halls (7 000sqm), temporary exhibition space ( 1
500sqm), cabinet of coins (1 000sqm), workshops, cafe, cinema, mixed-use hall
(300 sqm), gallery shop, skywalk to old Bode Museum
The mission was extension of Bode Museum, one of the most famous
museum in Berlin. The plot has very unusual space which is boarded by railway,
square and promenade.
Volumes are made by large podium which is usning all size of plots. In the podium
are all facilities and temporary exbition space. On the podium are placed volumes
of permanent exhibiton which are boarded by facades which correspondent with
old museum building. The position of the volumes isnt random, they are placed
with focus of daylight and indoor views.
The whole concept is explained on the next page under diagrams.
PROJECT SUMMARY.
height 31 m
lenght 125 m
building area 18 000 sqm
no. floors 4exterial finish material plaster, glass, concrete
moderni instituce pro klasicke umeni
BODE MUZEUM vypracoval:
Jan Tyrpekl
vedouc bakalsk prce:
Prof. Ing. arch. akad. arch. Ji Suchomel
vkres: slo vkresu:
5 10 201mtko:
0 15.1.2010
datum:
1 Foyer2 Vstavn sl 1 "kupole"3 Vstavn sl 24 Vstavn sl 35 Vstavn sl 4 "atriov"6 Vstavn sl 5 "bazilikln"7 Vstavn prostory s posuvnmi stnami8 Vstavn sl 69 Nkladn vtah11 WC mui12 WC eny13 Odpoinkov mstnost14 Infopoint15 Nkladn vtah16 Odpoinkov mstnost pro zamstnance17 Sklad materilu 18 Kancel 1619 Kancel 1720 Kancel 1821 Kancel 1922 Kancel 2023 Kancel 2124 Kancel 2225 Vdeck dokumentace26 Zasedac mstnost27 Sklad28 Fotoarchiv29 Koprka30 Kancel 2331 Kancel 24 32 Kancel 2533 Kancel 2634 Kancel 2735 Sekretarit36 Kancel editele Byzantskch sbrek37 ekrna38 Archiv39 Archiv40 Sklad41 WC mui 42 WC eny43 Kuchyka
1
23
4
5
6
7
78
13
10
1112
36
14
15
3534
33
32
31
30
23
29
28
27
26
25
24
16
18
17
19
20
21
22
23
37
38
39
40
4142
43
+6 000
+6 000
+6 000
+6 000+6 000
+0,000
+6 000
1:400 Pdorys 2.NP C.3.3
project no. 01 THE EXTENSION OF BODE MUSEUM Museum Island, Berlin, GE
portfolio Jan Tyrpekl 2010
BODE MU
ZEUM
vypracov
al:
Jan Tyrpe
kl
vedouc b
akalsk
prce:
Prof. Ing.
arch. aka
d. arch. J
i Suchom
el
vkres:
slo vkr
esu:
mtko:
15.1.201
0
datum:
1:1000
Schma p
rhled
Hmoty v
stavnch
sl nejs
ou rozms
tn libov
oln, jak
by se moh
lo na prvn
pohled z
dt. Jsou
na sebe
navzan
tak, aby
umoov
aly prhle
dy skrz ce
l muzeu
m horizon
tln i ve
rtikln, a
tm je ur
en jejich
vztah a o
ptick pro
pojen. N
ejdleit
j
prhledy
jsou ze v
stupnho
bodu v a
triu, v sam
m vrcho
lu konzole
(vstavn
sly 6,7)
a pn
prhled, k
ter pokr
auje a k
pvodnm
u Bode m
uzeu. Dal
jsou ori
entovny
na zajm
av msta v
okol, na
nmst,
vstupn p
dium atd.
Nvtv
nk tak m
e
objevova
t neustle
nov mom
enty, pe
stoe sam
otn vst
avn sly
jsou navr
eny za
elem posk
ytnut co
nejlepch
podmne
k
pro expon
ty. Rano
van tedy
nejsou p
rostory sa
motn, a
le vztah m
ezi nimi.
1.NP
2.NP
3.NP
C.7.2
vypracoval:
Jan Tyrpekl
vedouc bakalsk prce:
Prof. Ing. arch. akad. arch. Ji Suchomel
vkres: slo vkresu:mtko:
15.1.2010
datum:
BODE MUZEUM 1:1Detail stenho svtlku z mlnho dvouskla C.6.1
Pn ez slem s posuvnmi stnami 1:100System of lightingSystem of indoor views
The place is situated near Museum Island across The Kupfegraben canal. On the Museum Island there are five famous museum: The Bode Museum, Pergamon, New Museum, Old Museum and Old National Gallery
In the competition there was a requierement for a main entrance from new square. But a lot of people are supposed to come from the other side. Because of it I designed two stairs on podium where the main entrance is placed. There is also designed interesting public space in front of the foyer.
The environment was very important during process of designing. The new building repects the old one. The wall is graduating by horizontal console towards the river Spree and it is
I turned the process of designing and firstly I designed exhibition halls with nice dimensions and then I placed them on the podium. The position is not random. There is system of indoor and outdoor views and no direct sun in exhibition halls.
BODE MUZEUM vypracoval:
Jan Tyrpekl
vedouc bakalsk prce:
Prof. Ing. arch. akad. arch. Ji Suchomel
vkres: slo vkresu:mtko:
15.1.2010
datum:
1:1000 Schma osvtlen
Vstavn sly jsou osvtleny dle soutnch poadavk. Kabinet minc a prostory pro doasn vstavy jsou osvtleny pouzeumlm svtlem (skrz mln sklo v podhledu, ppadn bodovm). Sly stl expozice jsou osvtleny vdy rozptlenmdennm svtlem. V 2.NP se odra svtlo od protilehlch stn do bonch oken, zatmco ve 3.NP je svtlo pivdno stropemskrz mln dvojsklo a navc mlnm podhledem. Vechny sly se mohou dosvtlovat umlm svtlem bodovm iceloplonm umstnm v podhledu.
1.NP 2.NP 3.NP
LEGENDA: Vstavn prostory bez dennho ovtlen Vstavn prostory osvtlen shora Pm svtlo Odraen (difuzn) svtlo
C.7.1.1
It is expected to build new promenade and square between University Library and new building of Bode Museum. I decided to keep borders and use all place.
project no. 01 THE EXTENSION OF BODE MUSEUM Museum Island, Berlin, GE
exhibition
temporary exhibition temporary exhibitionfoyercinema
exhibition
exhibitionexhibition exhibition
exhibition
project no. 01 THE EXTENSION OF BODE MUSEUM Museum Island, Berlin, GE
portfolio Jan Tyrpekl 2010
project no. 02 FLAT-BUILDING, Liberec, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch. Jiri Bucek, ing.arch. Filip Horatschke
program: apartmans, offices, shops, garages The aim of the project is to work up a block of flats in the Liberec city centre. Place is situated near a square, frotal facade is orientated into one of a
main Liberec promenades Moskevsk street, the longer facade to the Jezdeck
street. Insolation is a main problem of this building plot, because there is a line of
houses in a close neighbourhood. The other problem is a various dimensionality of
the streets the house opens out to. As the Moskevsk street and Prask street are main thoroughfares of the city centre, Jezdeck street is a very narrow connection
of previous two streets.
My aim is to keep a character of the streets, therefore I made several analyses
which you can see on this page.
project summary:
height 22,5m
lenght 41m
width 15m
no. apartments 24
no. shops 2-8
no. floors 9exterial finish material plaster, glass, wood
FLAT-BUILDING, LIBEREC
project no. 02 FLAT-BUILDING, Liberec, CZ
-7 200
-4 500
0,000
+3 200
+6 900
+9 800
+12 700
+15 600
+18 500
+21 600
-7200
-4500
0,000
+3200
+6900
+9800
+12700
+15600
+18500
+21600
10 m
10 m
rez CCrez EErez BBPOHLED SV (Moskevsk)
rez AArez DDpohled SV (Jezdeck)
17,65 %17,65 %
BBBBEE
EE
CCCC
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500 7300
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7300
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7300
7300
7 300
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
- 2.PP- 1.PP
1.NP2.NP
3.NP - 6.NP7.NP
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
10 m
-7 200
-4 500
0,000
+3 200
+6 900
+9 800
+12 700
+15 600
+18 500
+21 600
-7200
-4500
0,000
+3200
+6900
+9800
+12700
+15600
+18500
+21600
10 m
10 m
rez CC rez EE rez BB POHLED SV (Moskevsk)
rez AA rez DD pohled SV (Jezdeck)
17,65 %17,65 %
BBBBEE
EE
CCCC
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500 7300
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7300
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7500 7500 7500 7500 7500
32003850
36503400
7300
7300
7 300
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
1 2 3 4 5 6
1
2
3
4
5
- 2.PP- 1.PP
1.NP2.NP
3.NP - 6.NP7.NP
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
AA AA
DDDD
10 m
project no.02 FLAT-BUILDING, Liberec, CZ
portfolio Jan Tyrpekl 2010
SUMMER TERM 2009 MARCH: 3.visiting Rome 4.Piazza del Campidoglio, Pallazo Nuovo, S.Maria in Aerocoeli, Piazza del Venezia, Forum Romanum, Palatin 5.Piazza Navona, S.Andrea della Valle, Pantheon, Il Ges, S. Ignazio di Loyola, S. Carlo alle Quattro Fontane, Fontana di Trevi 6.Piazza del Popolo, Pincio, Palazzo Barberini, Pizza Quirinale, San Pietro, Galeria Nazionale dArte Moderna 7.Piazza di Spagna, Villa Borghese, Museo Nazionale de Villa Giulia, 8.return home 9.start of the semester 10.optional entry to atelier of Adam Gebrian-Problems of the Liberec city 11.start of the research-history, economics, news of the Liberec city 12.indoor rock climbing 13.boulder,visit Fragnerova gallery 17.lecture of Josef Pleskot 18.interview with David atelier new work. project of villa-details and vizualization,indoor rock climbing 19.finish of reading book: J.W. Goethe-Faust 20.finish of reading book: Thom Heyerdahl-Kon-Tiki: Across the Pacific in a Raft (pao-pao) 24.lecture Kuba, Pilar, movie festival about human claim Jeden svet - movie Gyumri-earthquake in Armenie, Rene 27.exhibition Adolf Loos, Prague 29.lecture of salsa 31. prezentation of the research of Adam Gebrian studio (HSH, Cyril Rha), lecture HSH APRIL: 3. Faculty of the textile ball 5.visiting Obamas speak in Prague, lecture of salsa, contract for second job-vizualization of new family house 7. lunch with Adam Gebrian-discussion about portfolium and working abroad,indoor rock climbing 8. first critics of atelier Bucek- the research of the space, photo, problems, possibilities, lecture of Petr Rezek-Bauhaus 10.bike trip 75km 12.lecture of salsa 13.Easter, the crosscountry skiing 16. V.Hugo- Les Miserables 17.the concert Sto Zvrat 19.Salsa, Family celebretion 21.movie Persepolis...
analysis of the horizontal directions (Moskevska)
analysis of the vertical directions (Moskevska)
analysis of the height of buildings (Moskevska)
kolem bylo navrhnout bytov dm v centru Liberce.Parcela se nachz na rohu Moskevsk a Jezdeck. Je hlubok zhruba 40m, irok 15m, piem smrem do Moskevsk je orientovna krat stranou. Roh na spojnici tchto ulic je zkosen. Parcela se nachz v na relativn klidnm mst v blzkosti Naivnho divadla u p zny, umstn je tedy logick. Pi nvrhu hmotovho een jsem se zabval dvma zsadnmi aspekty. Prvn byl kontext. Hledal jsem takov een, kter maximln vyuije potencil parcely, ale zrove stle zstane v mtku okolnch budov. Stecha budovy je tedy na stejn rovni jako je maximln vka okolnch staveb (nap. Naivn divadlo).Jezdeck smrem k Prask kles, spolu s n i zstavba, kter na n navazuje. Proto jsem se rozhodl, e tmto smrem bude stecha se tak o jedno patro sn. Ve spodn sti dm kopruje ulin ru, aby zachoval souasn psoben obou ulic. Zatmco Mo-skevsk je po Prask nejvt tepnou mozi hornm a dolnm centrem, Jezdeck m charakter velmi zk ulice, spe koridoru, kter tyto tepny spojuje. Druh aspekt bylo osvtlen byt. Parcela je velmi hlubok a nen mon ji zastvt po celm obvodu. Vytvoil jsem si pomocn schmata, kter se dila osvtlenm jednotlivch byt a rovn minimlnm zastnnm okolnch dom. Tyto schmata urila mon obvod bytov sti domu. Byty mohly bt umstny a od urit vky (zhruba 9m). Pod nimi jsou umstny patra s obchody a kancelemi. Kvli nim je konstrukce skeletov, aby umonila maximln exibilitu vnitnch prostor. V kadm vym pate je umstno 6 byt, 4 dvou-pokojov a 2tpokojov. V poslednm ptm pate je umstn velk apartmn. Vechny byty maj francouzsk okna kvli maximlnmu vyuit den-nho svtla. Tyto okna jsou pak opateny devnmi posuvnmi okenicemi, kter umouj vytvoen soukrom dle libosti. Kad byt m v suternu sklep a parkovac msto.Pi een fasdy jsem zkoumal souvislosti okolnch budov, jak je vidt na piloen dokumentaci. Z nich jsem odvodil pravidla. kterch jsem se snail dret. Jedn se zejmna o respektovn horizontlnch lini pi pohledu z dlky a pevahy lini vertiklnch pi pohledu v blzkosti budovy.
Maximum Kontext Svteln podmnky een
+ + =
Situace
Lokalita
Parcela Vertikln linie okolnch budov Horizontln linie okonch budov Vka okoln zstavby
max height context sunshine FINAL
project no.02 FLAT-BUILDING, Liberec, CZ
project no. 03 PAPIROVE NAMESTI, Liberec, CZ
portfolio Jan Tyrpekl 2010
program: analysis and sulotion of Liberec city probleminstructor: ing.arch. Adam Gebrian
On the beginning of the summer term 2009 I decided to enter
optionally to the studio of Adam Gebrian. Adam graduated on University Liberec
and SCIARC in Los Angels. He promised us to show teaching methods of US
Universities. The topic was problems and oppotunities of the Liberec city. I
started to search some problem which could be interesting for me. Finally I chose
the district near Liberec centre. I made completaly analysis as you can see on
next pages. I cooperated with magistrate and other specyalists. Other student
chose for example unusing place in the area of the hospital, bus station, building
gap in the centre etc. Unfortunately I had possibility to make only first part of the project because later I started to work and I hadnt time for both. We presentated
the analysis on projector so on next pages you could see the prezentation.
project no. 03 PAPIROVE NAMESTI, Liberec, CZ
DEATH VALLEY, LIBEREC
project no.04 HOTEL MONTANIE, Sous, CZ
portfolio Jan Tyrpekl 2010
instructor: ing.arch. Zdenek Franek, ing.arch. Radek Suchanek program: apartmans(180 beds), outdoor and indoor swimming pool, sport hall, convention hall, restaurant, bar, 2 squash courts, offices, parking(90 cars) I worked on the project which was based on the student competition announced in summer 2008. The subject of the project is a five star hotel, which should be built on the east side of the Sou water reservoir in Jizersk hory. Nowadays there is a lodging house on the location, that will be disposed subsequently. The hotel is to be realized in tho phases and an adittional bulding should be in progress during continual service. The object behaves peaceable to the landscape. Building is horizontal and respects a water area in front of it. Only a parking and a part of a sportshall are embedded into terrain. The terminal mass has an expressive form, with its consoles reminding a ship is getting passers-by to know about it well. A sports equipment of the hotel is above standard. There is an outdoor and indoor 15x6m swimming pool, fitness, welness, sauna, game room, gym, two squash courts, hall with a tennis court and outdoor multipurpose playground. There is also a hall for 120 people, two restaurants, boutique, haidressers, manicure, pedicure and massages. 90 beds are planned in the first phase and the same amount is planned in the second phase. There are mainly double-rooms and all of them have a view onto the water reservoir.project summary - max. height: 18,5m, max. lenght 180m, max. width 15m, no.
apartments 92, no. floors 5, no. parking places 90
project no.04 HOTEL MONTANIE, Sous, CZ
project no. 04 HOTEL MONTANIE, 2nd VERSION, Sous, CZ
portfolio Jan Tyrpekl 2010
After the final presentation of the project there were two more weeks to the competition presentation. I decided to make the concept more clear. The big
competition requierements and the virgin landscape where the building should
be built seemed to me to be so extreme so that I chose also an extreme way. It
means that the hotel doesnt devastate the nature and becomes almost invisible
because its walls and roof are overgrown by some vegetation so the building
gives more green than it takes. Than I made some more changes which are
presented on this page by comix pictures.
project summary:
building volume 32 000m3
build-up area: 3 100sqm
useful area: 9 000sqm
external cladding: 11 500sqm
external cladding/air: 6 500sqm
glass: 1050sqm
GREEN AREA
project no. 04 HOTEL MONTANIE, 2nd VERSION, Sous, CZ
bird-view apartman
view-toweroutdoor swimming pool
project no.05 GARDEN SUB-URB, Semily, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch.akad.arch.prof. Jiri Suchomel, Ing.arch. Saml
The theme was design new part of the town Semily. Semily has about
9000 inhabitants and the number still grow up. Because of this magistrate decided
to use green area about city. The first one was lacation green meadow. They wanted to put here new energy-saving family houses and split-level houses.
The location has many special problems. The biggest one was eko belt
protected biology zone around all area. So its very difficult to make acces for vehicles. Its connected also with complicated topographic plan. The basement
was section of the terrain which show us possibility for roads.
The next problem was keep maximum of privacy with condition of large garden of
every house. I made masterplan which diveded area into 39 parcels. There was
also playground and small park. Majority of parcels you could enter from the north.
On this part was also placed house so gardens were shined from the south and
simultaneously the house was wall keeping the privacy of the garden. Every house
had view to the hills on the south. Closer to the city was placed nine attached
houses.
project summary - total area: 68 200sqm, no. family houses: 29, no. attached
houses: 9, size of parcels: 600-1100sqm, lenght of roads: 1600m, other facilities:
park, playground
project no.05 GARDEN SUB-URB, Semily, CZ
project no. 05 GARDEN SUB-URB, Semily, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch.akad.arch.prof. Jiri Suchomel, Ing.arch. Saml program: typical family sub-urb house
The family house is placed on the parcel with size 1105sqm (house
no. 17 in masterplan on previous page). His position is on the north because of
sunshining on the garden. The request was energy-saved house therefore it had
compact shape. It is made two different cuboids. The first one was from concrete blocks and northern half of it was situated into hill. The second part was opened to
the garden. There were children-rooms, playroom and other facilities(bathroom for
childen, machine-room).
The second cuboid was on the top. His construction and facade was wooden.
There were living-room, kitchen and bedroom for parents.
project summary - no. floors: 2, no. bedrooms: 5, flooring: 210sqm, material: concrete blocks, wood, glass
project no. 05 GARDEN SUB-URB, Semily, CZ
project no. 05 GARDEN SUB-URB, Semily, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch.akad.arch.prof. Jiri Suchomel, Ing.arch. Saml
Attached houses are located to the south on the lowest part of a given
plot. In spite of its location near to the forest it has an opportunity of a nice view
of the town Semily below and the landscape above. There are 9 houses. Each of
them consists of 2 cubuses. The upper one is situated across the lower one and is
turned to the South. The lower part is made of concrete blocks because it is partly
dug in the ground. In this part there are bedrooms located to the South and the
upper part is built by the wooden system of a construction two by four and there
is a living room, dining room, kitchen and a garage.
Althought they are attached houses they are very comfortable because
of its size and privacy. The garden has two levels. The top one is between the
upper cubuses and is suitable for planting trees there because the trees wouldnt
be a barrier to the view and they could make a natural fence between the garden
and a road.
project summary - flooring: 210sqm
project no. 05 GARDEN SUB-URB, Semily, CZ
project no. 06 THE FACULTY OF ARCHITECTURE, Venezia, IT
portfolio Jan Tyrpekl 2010
program: ateliers, dormitory, dwelling for quests and professors, library, gallery,
theatre, marina, gallery
Doc. Martin Rajnis asked us to design a new Faculty of architecture
for 500 students in lagoon of Venezia. He chose the Island San Giorgo about
2km from Venezia because of a close contact with a very specific place and a serene surface of the sea. Every student could choose one part of the Faculty
(for example dormitory etc). In the end of the term we formed small groups (3-4
students) and made final concept of the whole Faculty. I decided to project sport facilities. You can read about it more on the next page.
The other parts were dormitories, studios, info point, dwellings for professors
and guests, library, theater and marina with lighthouse. The final solution was a system of buildings placed in the lagoon and the most of movement was
provided by boats. The island was the gate to the campus and the info point,
catering establishment and the main cultural instituon- library, theater were
located there. From the island there was an axis to the rest of the campus. In the
centre there were studios and the structure was gradually breaking down into
the dwelling. The biggest part was the dormitories located into the old French
flat-top Clemanceau. I didnt design just the sport hall but also boulder and climbing wall in the middle
of the lagoon so that the climbers could fall to the water. The next part of my
work was the boat-house for tourists and the last one was the revitalization of the
south beach.The lagoon is not available for swimming because of a pollution of
the water but during the summer it could be a pleasant place for relaxation.
project summary - number of expected students: 500, area: 500x900m, depth of
lagoon: 1-3m
SPORT HALL
program: playground, playroom, ping-pong, fitness, bar The first question was which of the facilities were important for students. On the beginning I calculated with a swimming pool, a sport hall, a football playground and next smaller facilities. But because of the size of the area it couldnt
be possible I decided just for one sport centre and other smaller activities which didnt have requirements for a large area
like the climbing rock or the boat-house.
After many variants I put half of the project under the water level. It had many reasons. Firstly I placed the hall on the island
but after some discussion with my schoolmates and professor we agreed with the fact that the island should be the gate with
representative buildings. After that I knew the hall should be somewhere in the lagoon so it could be seen from everywhere.
When I tried to put all the activities and facilities into one it was too bulky on the comparison with the island. Because of
this fact I hid part of it under the water to the bottom of the lagoon. Above the water level you could see only the roof of
the oval shaped main ground. Around it there was the rest of the facilities like a machine-room, toilets, stores and also a
playroom, ping-pong, fitness and bar. Above these rooms there was a mall for passers-by who could enter the building or just pass it.
The main playground had the official dimensions and around it there was a tribune. So that the hall was ideal for training or could be rented for professional sport events like baseball matches, floorball or handball.
project no. 06 THE FACULTY OF ARCHITECTURE, Venezia, IT
project no.07 MIXED-USE HOUSE, Sluknov, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch. Zdenek Franek, ing.arch. Radek Suchanek
program: shops, apartmans, parking, garden
The topic was designed mixed-use building in the centre of Sluknov.
Sluknov is a small town with 6000 inhabitants on the north of the Czech republic
near board of Germany and Poland. In the centre is large free area. Developer
decided to build here mixed-use house and he asked our professor Zdenek
Franek for design. And he wanted to compare his project with student work. At
that time I was interesting about conext of historical and modern building so I
decided to design project which looks very modern but considerate to the other
buildings at the same time. I chose organic shape but it had very strict rules. The
height of the structure copied the height of house in the neighbourhood. Curves
in grounplan was determinated by lines of force, It means it was a mirror of
surrounding houses.
project no. 08 TWO FLATS, Brno, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch. Zdenek Franek, ing.arch. Radek Suchanek Docent Franek started to learn on our Uni in winter term 2006. I have admired his work so I decided to enter to his atelier. On the beginning of the semester he asked us for short work (6 days) because of he wanted to get know our ability and knowlodge. The mission was design two houses in the building gaps in Brno, near his atelier. The houses was to have been for us and our family. The gaps are very small and opposite to each other. The smaller one has triangular groundfloor, the second one deep rectangular. I chose the smaller one for me and I started to think what is important for me. In my opinion people dont need large dwelling like is usual in Czech republic. In my case I didnt have problem with total flooring 21sqm. The house wae able to seat two persons. In first floor is bathroom an space for sport equipment. In the second floor is kitchen with dining-room and in the last one is bedroom. In front of facade is construction for creepers because of shadow during summer. The second house, designed for my parents is more deep and it had better standard. There were comfortable stairs and more representative living room.
project no. 08 TWO FLATS, Brno, CZ
HOUSE no.1 - FOR PARENTS
volume 482m3
height 9m
lenght 6m
width 3m
no. floors 3flooring 54sqmmaterial brick, glass, concrete
HOUSE no.2 - FOR ME
volume 190m3
height 9m
lenght 6m
width 2,5m
no. floors 3flooring 21sqmmaterial brick, glass, concrete
instructors: ing.arch.akad.arch. Jiri Suchomel, ing.arch. Saml program: bus stop, parking, promenade, park, info-point Sloup is a very popular village. In the neighbourhood there is a stone castle, chateau, outdoor theatre, piscina etc. Because of these attractions the village is full of the tourists during summer. Almost everyone arrive to this place on road 268 (Nov Bor-Zakupy). The first thing you see when arriving to the village is a big crossingroads in the center. During last years this place was something like a store of asphalt. The topic was to cultivate this place. The biggest problem was a conflict between pedestrians and vehicles because the cars speed is quite high there. I decided to isolated vehicles from pedestrian. The terrain make possible to divide pedestrian and placed communication for them to upper level. This solution has several adventages. If you arrive by car, walls make something like enter coridor. It is crowned by footbridge. Because of the lenght oof the walls (about 100m) you can feel it in the car. Also the distance of the walls is quite short so drivers instictively decelerated. On the opposite pedestrian have nice view on the castle and they can feel sefely because the cars are hidden. In the walls are caves-bus stop. This is the citation of the history because in the past the people made lot of artificial caves.Project contents also park where you can sit, relax and see on the castle. The last part of project is info-point near bus stop and parking so tourists could very easy get know important information.
project no. 09 CROSSROAD, Sloup, CZ
portfolio Jan Tyrpekl 2010
project no. 09 CROSSROAD, Sloup, CZ
project no.10 AVIARY, ZOO Liberec, CZ
portfolio Jan Tyrpekl 2010
instructors: ing.arch.akad.arch. Jiri Suchomel, ing.arch. Saml
The aviary was my second university project. ZOO Liberec asked our
faculty to design an aviary for wader birds so that the visitors could enter inside
and walk between the birds. The shape had to be very specific because of the birds safeness. There shouldnt be any closed angles and edges. The second
determinatiton of the shape were statics reasons.
I wanted to make it very light and almost invisible so that the people and birds
could feel naturally. The location is in a rough terrain permeated by high trees.
I was looking for a shape corresponding with my ideas. Finally I projected a
dynamic cupola made of 4 rounded beam. Later I realised that the shape is
similar to the construction of some tents. project summary:
volume 13 300m3
height 23,6m
lenght 35m
width 33m
lenght of footpath 67,2m
project no.10 AVIARY, ZOO Liberec, CZ
project no.11 BOAT-HOUSE, Gabcikovo, Slovakia
portfolio Jan Tyrpekl 2010
instructors: ing.arch.akad.arch.prof. Jiri Suchomel, ing.arch. Saml
program: boat store, bar, reception
Boat-house Gabcikovo was my first school project. The topic was to design service objects for tourist and people from Bratislava who want to relax
there. The area around Danube river is used for sport activities like cycling,
running but especially roller-skating because there are long asphalt paths. But
nowadays there are not any facilities for people. Only somewhere you can find kiosks but not located near the paths because of military and safety rules.
We could choose which building we want to design. I chose a boat-house. My
colleagues designed a restaurant, fast-food and info point.
The boat-house is floating on the water level. I think it is the best solution for the service of renting and storing canoes because you dont have to pull them to the
bank. The boat-houses ergonomy is determinated by flowing water of Danube river. Inside there is situated a store for ten canoes, reception and other facilities.
The construction is completely wooden. Only pontons are made of steal. The roof
has a flabelliform. The building is used only during spring and summer. For the rest of the year it is possible to take it to the dock.
project summary:
number of boats indoor 10
lenght 21,8m
width 10,9m
flooring 46,3sqm
14 000
500
0
21800
110
00
1
15
2
3
4
5
receptionstaff-roomfacilitiesboat-room
project no.11 BOAT-HOUSE, Gabcikovo, Slovakia
project no.12 CHURCH
portfolio Jan Tyrpekl 2010
I was making the model during studying of high school when I started
to interest about architecture. Finally I made three projects before I started to
study architecture. The first one was the church which you can see here. It was followed by shopping mall and congress centre.
The model was based on few sketch.I imagined this church on free green area.
The church take energy by long curved wall ending in the nature. Dominants are
two towers over the landscape.
project no.12 CHURCH
project no.13 SHOPPING CENTRE
portfolio Jan Tyrpekl 2010
The second project was shopping mall. It has two part. First one was
administrative and shop and the second, very unusual and unusual and catching
shape, where show rooms with completely curtain glass walls were.
project no.13 SHOPPING CENTRE
project no.14 CONGRESS CENTRE
portfolio Jan Tyrpekl 2010
This is the third and last project which I was made on high school. It was
congress centre which was placed near castle Stirin, in CZ. In the neighbourhood
of the Prague is a lot of similar institution. During designing this project I started
to interesting about interier so dominanting space is main congress hall with high
and narrow windows.
project no.14 CONGRESS CENTRE
During first year of studium my classmates had a topic pedestrian bridge. It was interesting theme for me so I tryied to design it myself. The pedestrian bridge over rhe river was something like exam of static for me. I was tryinhg to find a new princip of consruction. Finally I designed bridge with two widely outspread arch which with their weigh holding up and keeping balance of the main deck. I am not able to calculate the load but my professor said it should be possible.I wanted to keep cleanness and simplicity. The most experessive part is red deck because of orientation. I wasnt thinking about place during design. But later I was find ing some acceptable place. I chose Reims in France. I remember similar interesting modern bridge from France, for example Bridge of Europe in Orlens by S.Calatrava or pedestrian bridge Simone de Beauvoir in Paris by Feichtinger Architectes.
project summary
lenght 51m
rise of bridge floor 1,5mrise of arches 9,5m
angle of arches 33
distance of the top of arches 23,7m
material steal
project no. 15 PEDESTRIAN BRIDGE
portfolio Jan Tyrpekl 2010
project no. 15 PEDESTRIAN BRIDGE
PROJECT DESCRIPTION
In 2007 I was asked by enterpriser from place of my residence for project of view-
tower. He is owner of enterteinment and accommodation complex in South
Czech near Jindrichuv Hradec, in small village Ratmirov. He started to renovation
the complex and his idea is expansion and make it more interesting for tourists.
Near the complex there is lake and lot of path for cycling and walking.
When I was thinking about concept the most importing thing for me was the act
of going up. People should feel free and forget other problems. Simultaneously
I wanted to keep the surprise on the top. So I made half-transparent skin from
wooden slabs. It is turning in the direct of the steps for increases of movement
and experession of rising up.
All tower is beared by heavy column in the middle. The stairs are fixed also into the column. Therefore the slabs doesnt support the static. It has only safety and
esthetic function.
PROJECT SUMMARY
height 15,8m
diameter 4m
number of slabs 1185
project time 10 days
project no.16 VIEW TOWER, Ratmirov, CZ
portfolio Jan Tyrpekl 2010
16 VIEW-TOWER, RATMIROV
project no.16 VIEW TOWER, Ratmirov, CZ