REBITECH MAINS D'OEUVRES CHANTIER
NOM AFFAIRE
43 JAMAIN BACO
SituationAu : 31/03/07 3,920.00 869.00 4,789.00 42,237.79 2,366.00 44,603.79
nb HN nb HS Total H Coût total
23/10/06 11/11/06 192.00 - 192.00 1,620.00 - 1,620.00 12/11/06 26/11/06 288.00 - 288.00 2,678.00 - 2,678.00 28/11/06 09/12/06 336.00 - 336.00 2,983.65 500.00 3,483.65 11/12/06 27/12/06 288.00 8.00 296.00 2,396.38 250.00 2,646.38
28/12/06 07/01/07
08/01/07 20/01/07 96.00 - 96.00 900.00 - 900.00 22/01/07 04/02/07 336.00 - 336.00 3,753.35 - 3,753.35 05/02/07 18/02/07 576.00 87.00 663.00 5,756.95 - 5,756.95 19/02/07 04/03/07 624.00 198.00 822.00 6,921.94 416.00 7,337.94 05/03/07 18/03/07 656.00 504.00 1,160.00 9,902.52 1,200.00 11,102.52 19/03/07 31/03/07 528.00 72.00 600.00 5,325.00 - 5,325.00
-
N° AFFAIRE
du(inclus)
au(inclus)
Coût MO Chantier
Frais divers du chantier
CONGE DE LA FETE
AID EL KBIR
REBITECH POINTAGE HEURES SIEGE
NOM AFFAIRE
43 JAMAIN BACO
Montant total du : inclus au : inclus
-
total DH 0 0 0taux/heure 30 22 16total heures 0 0 0 0
Driss SIHAM Mohamed coût/s
0 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 10 0 1
111111111111111
N° AFFAIRE
du(inclus)
au(inclus)
N° semaine
Total h/semaine
111111111111111111111111111111111111111111111111111111
11111
REBITECH EQUIPEMENTS ET LIVRAISONS CHANTIER
Montant total du : 4/1/2007
N° AFFAIRE NOM AFFAIRE
43 MOSQUEE SETTAT
Code article Designation
Date sortie Référence Code Désignation UTE
8/5/2008 11000011 TUBE ORANGE SOUPLE Ø 11 ML8/5/2008 11000013 TUBE ORANGE SOUPLE Ø 13 ML8/5/2008 11000016 TUBE ORANGE SOUPLE Ø 16 ML8/5/2008 14000600 U8/5/2008 71000000 FRAIS DIVERS MADANI U
8/18/2008 SOFA 11000011 TUBE ORANGE SOUPLE Ø 11 ML8/18/2008 SOFA 11000013 TUBE ORANGE SOUPLE Ø 13 ML8/18/2008 SOFA 11000021 TUBE ORANGE SOUPLE Ø 21 ML8/18/2008 SOFA 11000029 TUBE ORANGE SOUPLE Ø 29 ML8/23/2008 RETOUR 11000029 TUBE ORANGE SOUPLE Ø 29 ML8/23/2008 RETOUR 11000011 TUBE ORANGE SOUPLE Ø 11 ML8/23/2008 RETOUR CHUTTE TUBE ORANGE ML8/23/2008 RETOUR 14000600 U
10/31/2008 SOFA 21105001 CABLE U500V Ø 1.5 BLEU ML10/31/2008 SOFA 21105002 CABLE U500V Ø 1.5 ROUGE ML10/31/2008 SOFA 21105003 CABLE U500V Ø 1.5 JAUNE ML10/31/2008 SOFA 21105005 CABLE U500V Ø 1.5 V/J ML10/31/2008 SOFA 21205010 CABLE U500V Ø 2.5 BLEU ML10/31/2008 SOFA 21205020 CABLE U500V Ø 2.5 ROUGE ML10/31/2008 SOFA 21205030 CABLE U500V Ø 2.5 JAUNE ML10/31/2008 TOUTELEC 41000141 COFFRET ABONNEE 14 MOD INGELEC U10/31/2008 BUREAU 41000360 COFFRET ENC 36 MOD ABONNE U10/31/2008 21160010 CABLE U500V Ø 16 BLEU ML10/31/2008 21160050 CABLE U500V Ø 16 V/J ML10/31/2008 21400050 CABLE U500V Ø 4 V/J ML10/31/2008 21600010 CABLE U500V Ø 6 BLEU ML10/31/2008 21600020 CABLE U500V Ø 6 ROUGE ML10/31/2008 71300101 U10/31/2008 71300161 BARRETTE DOMINO Ø 16 U10/31/2008 72000000 SCOTCH NOIR U10/31/2008 14101000 BOITE ETANCHE 100X100 U10/31/2008 11000013 TUBE ORANGE SOUPLE Ø 13 ML11/8/2008 SOFA 21105001 CABLE U500V Ø 1.5 BLEU ML11/8/2008 SOFA 21105003 CABLE U500V Ø 1.5 JAUNE ML11/8/2008 SOFA 21105005 CABLE U500V Ø 1.5 V/J ML11/8/2008 SOFA 21400010 CABLE U500V Ø 4 BLEU ML11/8/2008 SOFA 21600040 CABLE U500V Ø 6 NOIR ML11/8/2008 SOFA 21400050 CABLE U500V Ø 4 V/J ML11/8/2008 SOFA 11000009 TUBE ORANGE SOUPLE Ø 9 ML11/8/2008 SOFA 14000600 U
BOITE D'ENCASTREMENT Ø 60
BOITE D'ENCASTREMENT Ø 60
BARRETTE DOMINO Ø 10
BOITE D'ENCASTREMENT Ø 60
4/22/2009 SOFA 29425001 CABLE TORSADE 4X25 U4/22/2009 SOFA 44000041 COFFRET COMPTEUR 4 FILS ONE - OGE U4/22/2009 SOFA 19609100 BOITE COUPURE 100A U4/22/2009 SOFA 71009620 COLLIERS COLSON 9X92 NOIR U4/22/2009 SOFA PINCE DENCRAGE U4/22/2009 SOFA PINCE DALINYAGE + BOLON 220 U4/22/2009 SOFA 36002012 CONTACTEUR MZ 201 Q70 U8/1/2009 TOUTELEC INTER SA ZENITH MARRON U8/1/2009 TOUTELEC INTER V V ZENITH MARRON U8/1/2009 TOUTELEC BOUTON PONSOIR ENCASTRE ZENITH MARRON U8/1/2009 TOUTELEC PRISE 2P+T U8/1/2009 TOUTELEC INTER DA U8/1/2009 TOUTELEC HUBLOT ETANCHE EN VERRE U8/1/2009 TOUTELEC LAMPE ECON U8/1/2009 TOUTELEC LAMPE B22 U8/1/2009 TOUTELEC LAMPE NEON 36W COMPLET U8/1/2009 TOUTELEC BALLASTE 1x36W U8/1/2009 TOUTELEC 71300161 BARRETTE DOMINO Ø 16 U8/1/2009 TOUTELEC CABLE BLANC 0,5 POUR TUBE NEON ML8/1/2009 TOUTELEC CABLE U500 SV ROUGE 2,5 ML8/1/2009 TOUTELEC CABLE U500 SV ROUGE 6 ML8/1/2009 TOUTELEC SA TICHKA8/1/2009 TOUTELEC PRISE 2P+T U8/1/2009 TOUTELEC DISJ 2x16A HAGER U8/1/2009 TOUTELEC DISJ 2x10A HAGER U8/1/2009 TOUTELEC INTER DIFF 4x25A 300MA U8/1/2009 TOUTELEC DOUILLE B22 U
EQUIPEMENTS ET LIVRAISONS CHANTIER
inclus au : 4/24/2007 inclus -
Date Arrêté 8/1/2009 17,108.70
Total Quantité Total Cout - -
Quantité PU HT TOTAL HT
350 1.7 595.00250 2.4 600.00200 2.7 540.00100 0.32 32.00
1 200 200.00100 1.7 170.00100 2.4 240.00100 4.7 470.0050 7.2 360.00-30 7.2 -216.00-50 1.7 -85.00-50 1.7 -85.00-57 0.32 -18.24
300 1.1 330.00300 1.1 330.00300 1.1 330.00500 1.1 550.00200 1.8 360.00200 1.8 360.00200 1.8 360.00
5 37 185.001 0.00
50 14 700.0012 14.18 170.16
100 3.23 323.00100 4.93 493.00100 4.93 493.00
4 3 12.003 8 24.003 2.9 8.701 5 5.00
50 2.4 120.00300 1.1 330.00300 1.1 330.00300 1.1 330.0080 3.23 258.4060 4.93 295.8060 3.23 193.80
100 1.68 168.004 0.32 1.28
450 12.5 5625.001 160 160.001 900 900.00
50 0.004 5.2 20.805 97 485.005 0.00
15 0.006 0.006 0.00
12 0.003 0.00
18 0.0018 0.0010 0.0024 0.0024 0.00
6 9 54.0060 0.0060 0.0020 0.005 0.00
10 0.0014 0.005 0.001 0.00
30 0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
REBITECH
N° AFFAIRE NOM AFFAIRE43 JAMAIN BACO
Toutes valeurs en DH HTETAT DES DEPENSES ENGAGEES
Totaux : 63,614.25 42,237.79 2,366.00 - - - - - 99,515.12 1,544.00
Commentaires MO Chantier MO siège Total H
11/11/06 13,663.73 1,620.00 - - - - 15,283.73 192.00 26/11/06 5,156.00 2,678.00 - - 7,834.00 288.00 09/12/06 - 2,983.65 500.00 - 3,483.65 336.00 27/12/06 390.00 2,396.38 250.00 - 3,036.38 296.00 20/01/07 - 900.00 - - 900.00 96.00 04/02/07 2,402.60 3,753.35 - - 6,155.95 336.00 18/02/07 8,702.92 5,756.95 - - 5,756.95 04/03/07 8,212.00 6,921.94 416.00 15,549.94 18/03/07 24,535.00 9,902.52 1,200.00 35,637.52 31/03/07 552.00 5,325.00 - 5,877.00
- - - - - - - - - - - -
- - - - - - - - - - -
Date engagement
Equip. et livraisons chantier
Frais divers chantier
Frais déplacem.
Frais réception
Frais techniques
siège
Frais bancaires
TOTALDEPENSES
- -
REBITECH
Nom Affaire
43 JAMAIN BACOTABLEAU DE BORD Toutes valeurs HT
Achats Chantier Autres frais Total dépenses
31/03/07 63,614.25 44,603.79 - 108,218.04 4,789.00
Historique
date Achats Chantier Autres Total dépenses
27/12/06 19,209.73 10,428.03 - 29,637.76 1,112.00 04/02/07 21,612.33 15,081.38 - 36,693.71 1,544.00
31/03/07 63,614.25 44,603.79 - 108,218.04 4,789.00
N° AFFAIRE
à la date du
Heures normales chantier
Heures normales chantier
montant du contrat 1,206,452.63
date montant HT
-
Total facturé Client
Suivi facturation
Total facturé Client