+ All Categories
Home > Documents > FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  ·...

FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  ·...

Date post: 27-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
31
December 6, 2016 Darryl VanMeter, PE, State Innovative Delivery Administrator Andrew Hoenig, PE, Senior DB Project Manager Tim Matthews, PE, Senior DB Project Manager December 6, 2016 Darryl VanMeter, PE, State Innovative Delivery Administrator Andrew Hoenig, PE, Senior DB Project Manager Tim Matthews, PE, Senior DB Project Manager FY2017 Design-Build Bridge Replacements & I-85 Corridor Bridges Industry Forum
Transcript
Page 1: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

December 6, 2016

Darryl VanMeter, PE, State Innovative Delivery AdministratorAndrew Hoenig, PE, Senior DB Project ManagerTim Matthews, PE, Senior DB Project Manager

December 6, 2016

Darryl VanMeter, PE, State Innovative Delivery AdministratorAndrew Hoenig, PE, Senior DB Project ManagerTim Matthews, PE, Senior DB Project Manager

FY2017 Design-Build Bridge Replacements & I-85

Corridor BridgesIndustry Forum

Page 2: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Disclaimer Statement

• At this meeting the Department will provide information about the project’s delivery goals, anticipated scope, anticipated Design-Build procurement process, and potential risks. Participants will be encouraged to ask questions during this meeting; however any information provided by Department shall be considered as informational only and is subject to change.

Page 3: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Agenda

• Design-Build Overview

• FY17 Low-Impact Bridge Bundles

• I-85 Corridor Bridges project

• Schedule

• Open Discussion

Page 4: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Design-Build• Design-Build

o Combines preconstruction related services with construction services into one contract

o Allows the contractor to participate in the project’s design in an effort to reduce costs, improve communication and expedite project delivery

• Governed byo 23 Code of Federal Regulations (CFR) Part 636o Georgia Code Section 32-2-81 (Enacted 2004)o Board Rules, Chapter 672-18 (Adopted 2006 & 2013)

Page 5: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Innovative Delivery$18,175,170

$79,332,696

$100,242,289

$3,028,000

$10,305,379

$0 $0

$80,857,487

$11,541,886

$17,128,865

$39,593,628

$53,491,473

$83,637,897

$195,776,388

$29,878,175

$223,908,692

$46,961,639

$0.00

$50,000,000.00

$100,000,000.00

$150,000,000.00

$200,000,000.00

$250,000,000.00

FY2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY 2016

Georgia Department of TransportationAmount Awarded to Design‐Build Contracts per FY

36 contracts totaling $994 million

Page 6: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Andrew Hoenig – DB Bridge Replacement PMTim Matthews – I-85 Corridor Bridges PM

Andrew Hoenig – DB Bridge Replacement PMTim Matthews – I-85 Corridor Bridges PM

FY2017 DB Bridge Replacements & I-85

Corridor Bridges

Page 7: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Project Overview

• State funds -> FY17 Batches• Federal Funds -> I-85 Corridor• Off-site detours (number of days will vary per site)• Low impact (minimal utility, hydraulic & env impacts)• No ROW• FY17 to maintain existing profile (or minimum

modification)• I-85 bridges may need raised profile for vertical

clearances• DBE Goals

Page 8: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

FY17 Bridge Locations

Page 9: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Anticipated Project Locations8 ‐ Bridge Serial Number Feature Carried Feature Intersected County District Floodway

North Geo

rgia

181‐5008‐0 JONES MARTIN ROAD DOZIER BRANCH LINCOLN 2 ZONE X

033‐0040‐0 QUAKER ROAD WALNUT BRANCH BURKE 2 Zone A

255‐0039‐0 VAUGHN ROAD HEADS CREEK SPALDING 3 Zone A

055‐5011‐0 GREEN ROAD CHATTOOGA RIVE TRIB CHATOOGA 6 ZONE X

045‐0074‐0 YUS VEAL ROAD BECKMAN CREEK CARROLL 6 NOT MAPPED

233‐5040‐0MOUNTAIN HOME LOOP 

ROAD LITTLE CEDAR CREEK POLK 6 Zone A

301‐5012‐0 ANSLEY ROAD LONG CREEK WARREN 2 Zone A

009‐5011‐0 ROBERTS ROAD FISHING CREEK BALDWIN 2 Zone A

South Geo

rgia

091‐0032‐0 MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A

093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY 3 Zone A

071‐0050‐0 DOERUN‐NORMAN PARK OKAPILCO CREEK COLQUITT 4 Zone A

239‐0009‐0 LOWER LUMPKIN RD HODCHOOKEE CREEK QUITMAN 4 Zone A

101‐5003‐0 TOMS CREEK ROAD TOMS CREEK ECHOLS 4 Zone A

275‐5003‐0 REICHERTVILLE RD MCKEEVER SLOUGH CRK THOMAS 4 Zone A

Page 10: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Fy17 Bridge Sites – North

• PicturesWarren CountyPolk CountyPolk County

Polk County

Page 11: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Fy17 Bridge Sites - South

• Pictures

Quitman County Colquitt County

Thomas County Colquitt County

Page 12: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Risks and Mitigation Strategies (FY17)

Risk Item Mitigation Measure

Geotechnical Include geotechnical boring logs/samples in the RFP 

Survey Database Include survey database in the RFP 

ROW Off‐site detourEvaluate constructability scenarios pre‐letObtain ROW certification from Locals during the RFP development

Environmental Select locations with minimal environmental impactsPerform environmental screening pre‐letRFP to include environmental related scope itemsRFP to include anticipated review/approval durations

Industry Perform industry outreach early and actively listen 

Design VarianceDesign Exception

Evaluate need for DV/DE during RFP developmentInclude approved known instances of DV/DE in the RFP 

Hydraulics Select locations where FEMA coordination is not requiredPerform hydraulics screening during RFP developmentInclude hydraulic memo in the RFPPre‐approve known hydraulic variance(s)

Page 13: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Risks and Mitigation Strategies (FY17)

Risk Item Mitigation Measure

Locals Outreach/Detour

Early and ongoing coordination with Locals during development of the RFPObtain ROW certification from the LocalsPost‐let coordination with Locals regarding detour schedule

Cost Estimate Continue to monitor industry trends

Detour Duration Evaluate and establish reasonable durations to perform the work for each bridge relocation

Overall ContractDuration

Establish reasonable durations per contract in order to complete all of the work

Utilities SUE QL‐D Early coordination with utility ownersExecuted MOUs included in the RFP

Page 14: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Tim Matthews – I-85 Corridor Bridges PMTim Matthews – I-85 Corridor Bridges PM

I-85 Corridor Bridges

Page 15: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

I-85 Corridor BridgesAnticipated Locations

Bridge Serial Number Feature Carried Feature Intersected County District COUNTY RD

I‐85 Co

rridor Brid

ges

157‐0022‐0 PLAINVIEW ROAD I‐85 JACKSON 1 250

119‐0025‐0 NEAL ROAD I‐85 FRANKLIN 1 258

119‐0035‐0 CEDAR RIDGE ROAD I‐85 FRANKLIN 1 387

119‐0023‐0 OLD STAGECOACH ROAD I‐85 FRANKLIN 1 187

119‐0017‐0 BROWN ROAD I‐85 FRANKLIN 1 97

119‐0016‐0 WHITWORTH ROAD I‐85 FRANKLIN 1 84

Page 16: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

I-85 Corridor Bridge Sites

Page 17: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Plainview Rd over I-85

Page 18: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Plainview Rd over I-85 con’t

Page 19: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Neal Rd over I-85

Page 20: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Cedar Ridge Rd over I-85

Page 21: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Old Stagecoach Rd over I-85

Page 22: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Brown Rd over I-85

Page 23: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Brown Rd over I-85

Page 24: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Whitworth Rd over I-85

Page 25: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Risks and Mitigation Strategies (I-85 Corridor)

Risk Item Mitigation Measure

Geotechnical Include existing geotechnical information and BFI in the RFP 

Survey Database Using Existing Bridge Plans

ROW Off‐site detour Evaluate constructability scenarios pre‐letObtain Right‐of‐Entry certification from Locals during the RFP development

Environmental Select locations with minimal environmental impactsPerform environmental screening pre‐letRFP to include environmental related scope itemsRFP to include anticipated review/approval durations

Industry Perform industry outreach early and actively listen 

Design VarianceDesign Exception

Evaluate need for DV/DE during RFP developmentInclude approved known instances of DV/DE in the RFP 

Hydraulics No Bridges over waterways

Page 26: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Risks and Mitigation Strategies (I-85 Corridor)

Risk Item Mitigation Measure

Locals Outreach/Detour

Early and ongoing coordination with Locals during development of the RFPObtain Right‐of‐Entry certification from the LocalsPost‐let coordination with Locals regarding detour schedule

Cost Estimate Continue to monitor industry trends

Detour Duration Evaluate and establish reasonable durations to perform the work for each bridge relocation

Overall ContractDuration

Establish reasonable durations per contract in order to complete all of the work

Utilities SUE QL‐D Early coordination with utility ownersExecuted MOUs included in the RFP

Page 27: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Roles and Responsibilities• Design-Build Team

o Schedule development/managemento Bridge designo Geotechnical reportso Stream buffer variance application (if needed)o USACE permit preparation (FY17 project only)o Install & maintain detour signageo Utility/coordination and relocation (if needed)o Replace each bridge within allowable detour duration

• GDOTo Submittal reviews and Env Special Studies preparation/approvalo Permit mitigation costso Construction Oversight/CEI

Page 28: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Anticipated Procurement Process

• Two Phase Low Bid o All qualified – (Pass/Fail)

• Phase I - Request for Qualifications (RFQ)o Two RFQs will be advertised

o Fy17 bridge batches combinedo I-85 Corridor will be separate RFQ & SOQ

o Restriction on communicationso One team may pursue one or both bridge “batches” (FY17

only)o Multiple Statement of Qualifications (SOQ) if different

prime team members• Phase II – Request For Proposals (RFP)

o Three RFPs will be advertised

Page 29: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Anticipated Procurement Process

• Phase II - Request for Proposals (RFP)o April 21 – Issue RFPs

Advertised on Bid Express RIDs on DB Secure Sharepoint site

o Price Proposal Submitted via Bid Express Construction complete pay items per bridge site

o Technical Proposal Simple narrative describing approach to designing and

constructing multiple bridges

Page 30: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Tentative Schedulea. GDOT issues Public Notice Advertisement (PNA) 10/28/2016 ----------

b. Industry Forum – GDOT Room 403/404 12/06/2016 10:00 A.M.

c. Industry one-on-one meetings – GDOT Room 407* 12/06/2016 12:00 - 4:00

d. GDOT issues Request for Qualifications (RFQ) 02/03/2017 -----------

e. Deadline for the submission of written questions and Requests for Clarification 02/17/2017 -----------

f. Deadline for Statement of Qualifications (SOQ) 03/03/2017 2:00 P.M.

g. GDOT issues the Notice to Finalists 04/10/2017 -----------

i. GDOT issues Request for Proposals (RFP) to the Finalists 04/21/2017 -----------

j. GDOT letting (receipt of bid/technical proposal from Finalists) 06/16/2017 -----------

Page 31: FY2017 Design-Build Bridge Corridor Bridges Industry Forum...2016/12/06  · 091‐0032‐0MILAN‐CHAUNCY ROAD SUGAR CREEK DODGE 2 Zone A 093‐5006‐0 WEEKS ROAD LILLY BRANCH DOOLY

Questions?

• GDOT Design‐Build Webpage

• http://www.dot.ga.gov/PS/Innovative/DesignBuild

• GDOT Design‐Build SharePoint Site

• http://mydocs.dot.ga.gov/info/designbuild/default.aspx


Recommended