+ All Categories
Home > Documents > Case study 20 Panvita Jezera V.2

Case study 20 Panvita Jezera V.2

Date post: 12-Apr-2017
Category:
Upload: henry-madders
View: 60 times
Download: 2 times
Share this document with a friend
3
NATURAL SOLUTIONS TO MAN-MADE PROBLEMS CITADEL ENVIRONMENTAL SOLUTIONS RAY LONG, MANAGING DIRECTOR // +44 7825248884 // [email protected] HENRY MADDERS, DIRECTOR // +44 7832 384223 // [email protected] NEW CITADEL BIOCAT+1™ PROJECT IN SLOVENIA Over 18% output increase with the addition of Citadel BioCat+1™ at the Panvita Jezera Plant in Slovenia, since the installation by Decos-re d.o.o, our Slovenian based JV partner. As a result of the outstanding Citadel BioCat+1™ perfomance, 2 new Panvita projects have started. Installed Power: 999 kW with 2 Digesters in Series D1: 3.500 m 3 D2: 2.000 m 3 Feedstock: Maize Silage, Pig Slurry, Maize Whole Corn (below 10% of total oDM) Feed mix as follows: MAIZE SILAGE PIG SLURRY CORN January 35,1t 53m 3 0,83t Feed equates to 39-40 tons of Maize Silage per day. February 34,5t 42m 3 1,36t At commencement of Citadel BioCat+1™ the power production was 19,6MWh/day increased to 23,3MWh/day.This represents an increase of 18,87% Feed oDM: 15,7t/day to 15,2 t/day this equates to a reduction of 3,2% kWh/oDM: 1.260 kWh/t to 1.540 kWh/t represents an increase of 22,2% Not the actual site
Transcript

NA

TU

RA

L S

OLU

TIO

NS

TO

MA

N-M

AD

E P

RO

BLEM

S

Citadel environmental SolutionS

RAY LONG, MANAGING DIRECTOR // +44 7825248884 // [email protected] MADDERS, DIRECTOR // +44 7832 384223 // [email protected]

NEW CITADEL BIOCAT+1™ PROJECT IN SLOVENIA Over 18% output increase with the addition of Citadel BioCat+1™ at the Panvita Jezera Plant in Slovenia, since the installation by Decos-re d.o.o, our Slovenian based JV partner.

As a result of the outstanding Citadel BioCat+1™ perfomance, 2 new Panvita projects have started.

Installed Power: 999 kW with 2 Digesters in Series D1: 3.500 m3 D2: 2.000 m3

Feedstock: Maize Silage, Pig Slurry, Maize Whole Corn (below 10% of total oDM) Feed mix as follows: MAIZE SILAGE PIG SLURRY CORN January 35,1t 53m3 0,83t Feed equates to 39-40 tons of Maize Silage per day. February 34,5t 42m3 1,36t

At commencement of Citadel BioCat+1™ the power production was 19,6MWh/day increased to 23,3MWh/day.This represents an increase of 18,87% Feed oDM: 15,7t/day to 15,2 t/day this equates to a reduction of 3,2% kWh/oDM: 1.260 kWh/t to 1.540 kWh/t represents an increase of 22,2%

Not the actual site

NA

TU

RA

L S

OLU

TIO

NS

TO

MA

N-M

AD

E P

RO

BLEM

S

Citadel environmental SolutionS

RAY LONG, MANAGING DIRECTOR // +44 7825248884 // [email protected] MADDERS, DIRECTOR // +44 7832 384223 // [email protected]

Citadel BioCat+™ Now applied in many countries, providing AD plant operators with increased reveue, derived from reduced input in feed stock and or increased output.

APPLICATIONS Different BioCat+™ formulations can be utilised in the following areas.

• Waste water Treatment • Bioremediation • Agriculture • Animal feed enhancement • Composting • Treatment lagoons • Odour control

For further information on how Citadel BioCat+™ can help you, please contact us for an assesment of your project.

INSTALLATION CPU The Citadel BioCat+™ range of products are generated on site in our Catalyst Production Units (CPU’s).

The CPU’s are manufactured at our factory in the UK partially from recycled materials.

CPU measurements:HEIGHT: 2400mm BASE: 900mm x1200mmInstallation requirements:• A SUPPLY OF POTABLE WATER• A 230 - 240V POWER SUPPLY• A LEVEL BASE (a structure to

support 1000Kg)• A full site survey will be

undertaken prior to installtion.

APPLICATIONS

1 11

2 12

3 13

4 14

1 11

2 12

3 13

4 14


Recommended