Date post: | 12-Apr-2017 |
Category: |
Documents |
Upload: | henry-madders |
View: | 60 times |
Download: | 2 times |
NA
TU
RA
L S
OLU
TIO
NS
TO
MA
N-M
AD
E P
RO
BLEM
S
Citadel environmental SolutionS
RAY LONG, MANAGING DIRECTOR // +44 7825248884 // [email protected] MADDERS, DIRECTOR // +44 7832 384223 // [email protected]
NEW CITADEL BIOCAT+1™ PROJECT IN SLOVENIA Over 18% output increase with the addition of Citadel BioCat+1™ at the Panvita Jezera Plant in Slovenia, since the installation by Decos-re d.o.o, our Slovenian based JV partner.
As a result of the outstanding Citadel BioCat+1™ perfomance, 2 new Panvita projects have started.
Installed Power: 999 kW with 2 Digesters in Series D1: 3.500 m3 D2: 2.000 m3
Feedstock: Maize Silage, Pig Slurry, Maize Whole Corn (below 10% of total oDM) Feed mix as follows: MAIZE SILAGE PIG SLURRY CORN January 35,1t 53m3 0,83t Feed equates to 39-40 tons of Maize Silage per day. February 34,5t 42m3 1,36t
At commencement of Citadel BioCat+1™ the power production was 19,6MWh/day increased to 23,3MWh/day.This represents an increase of 18,87% Feed oDM: 15,7t/day to 15,2 t/day this equates to a reduction of 3,2% kWh/oDM: 1.260 kWh/t to 1.540 kWh/t represents an increase of 22,2%
Not the actual site
NA
TU
RA
L S
OLU
TIO
NS
TO
MA
N-M
AD
E P
RO
BLEM
S
Citadel environmental SolutionS
RAY LONG, MANAGING DIRECTOR // +44 7825248884 // [email protected] MADDERS, DIRECTOR // +44 7832 384223 // [email protected]
Citadel BioCat+™ Now applied in many countries, providing AD plant operators with increased reveue, derived from reduced input in feed stock and or increased output.
APPLICATIONS Different BioCat+™ formulations can be utilised in the following areas.
• Waste water Treatment • Bioremediation • Agriculture • Animal feed enhancement • Composting • Treatment lagoons • Odour control
For further information on how Citadel BioCat+™ can help you, please contact us for an assesment of your project.
INSTALLATION CPU The Citadel BioCat+™ range of products are generated on site in our Catalyst Production Units (CPU’s).
The CPU’s are manufactured at our factory in the UK partially from recycled materials.
CPU measurements:HEIGHT: 2400mm BASE: 900mm x1200mmInstallation requirements:• A SUPPLY OF POTABLE WATER• A 230 - 240V POWER SUPPLY• A LEVEL BASE (a structure to
support 1000Kg)• A full site survey will be
undertaken prior to installtion.
APPLICATIONS
1 11
2 12
3 13
4 14
1 11
2 12
3 13
4 14